Maximizing BIM to Streamline Manufacturing Workflows With More Accurate Modeling

Time: 1:00 pm
day: a07Ti00000hkMr8

Details:

  • Ensuring accurate transfer of information from manufacturers into the BIM model to prevent fabrication errors and minimize adjustments in the shop
  • Evaluating best practices for optimal BIM communication and standardization to align design, detailing, and prefabrication
  • Collecting and analyzing project data to induce predictive analytics and machine learning, optimizing future workflows and improving decision-making to keep projects on track

Speakers: