Panel Discussion: Enhancing Collaboration Between Prefab Teams & Field Crews to Enable Smooth Execution & Prevent Delays
Time: 1:00 pm
day: a07Ti00000hlEtE
Details:
- Using historical data on scheduling, cost consistency, and on-site stress-reduction to strengthen field team buy-in to prefab
- Managing fabrication schedules alongside active construction to ensure prefabrication aligns with rapidly changing site conditions
- Providing clear guidance and detailed drawings for accurate field execution and preventing errors during installation